Difference between revisions of "Base Metals"

From Backstage Lore Wiki
Jump to: navigation, search
m (Protected "Base Metals" [edit=sysop:move=sysop])
m
Line 13: Line 13:
  
 
The [[Basic Industry Facility]] cycle (30 minutes) requires 3000 units of [[Base Metals]] to produce 20 units of [[Reactive Metals]]
 
The [[Basic Industry Facility]] cycle (30 minutes) requires 3000 units of [[Base Metals]] to produce 20 units of [[Reactive Metals]]
----
 
--[[Contributor_name:Wrexos|Wrexos]] 20:36, 23 September 2011 (UTC)
 
----
 

Revision as of 05:09, 24 September 2011

Available on planet types:

Barren
Gas
Lava
Plasma
Storm

Processing:

Processed using: Basic Industry Facility
Processed Material: Reactive Metals

The Basic Industry Facility cycle (30 minutes) requires 3000 units of Base Metals to produce 20 units of Reactive Metals

Personal tools
Namespaces

Variants
Actions
Navigation
Tools